In line with the advanced molding process and performance requirement of European air spring.
Wide-ranging

Four-column clamping structure, large clamping stroke, suitable for mold installation in the height range of 400 to 1100.

Improve product quality

High-temperature control accuracy, steam temperature control accuracy of ±2°, ensure the consistency of vulcanized parts and improve product quality.

Advanced gas control system

Precise control of high and low-pressure nitrogen via stages, satisfy various performance requirements of forming stages for different products.

Free programming

Siemens control system, self-programing, users can freely compile the production sequences according to the process requirements.

Eco-ftriendly

Pneumatic doors and all-around safety guards work together in response to safety standards while addressing the gas emissions collecting issue from vulcanization, which fulfills environmental requirements.

Industry Application

Service Process

01
Process/Mold Analyse and Design
  • Raw materials selection
  • Product design
  • Mold flow analysis
  • Mold design suggestion
02
Equipment Selection Suggestions
  • Product performance
  • Product quality
  • Ease of use
  • Safety requirements
03
Whole Plant Planning Advice
  • Planning of production line
  • Arrangements for people, machines, and materials according to process flow
  • Peripheral automation
  • Smart connection
04
Delivery Solutions
  • Professional installation and debugging
  • On-site operation training
  • Molding process training
05
After Sales Solutions
  • YFO services
  • Preventive maintenance
  • Device upgrade
Contact Us
Please leave your message, and we will contact you soon!
Verification code
I hereby give my consent for my personal data, collected and processed by YIZUMI in relation to my inquiry.
GET A QUOTE